IfEnergy
Japan Gets Ready for New Wind Farm
Filed in archive Wind by Reden Rodriguez on February 27, 2007
Japan Gets Ready for New Wind Farm
The Japanese prefecture of Hyogo has just signed a contract with Repower Systems AG for the supply of ten turbines to add to the 43 turbines that have been installed and is supplying almost 70 MW of power now. This is why wind power is beautiful. If a particular site has wind power potential, you can simply add turbines to the series and expand your capacity nominally. While this is the same for almost all renewable energy resources, it works best for wind because you easily call a supplier, sign your off-take contracts, install the turbines, and sit pretty watching the beauties turn around the whole day.



Permalink: Japan Gets Ready for New Wind Farm
Tags: Japan  Hyogo  Repower  Systems  AG  Wind  Renewable  Energy    wind  wind+farm 
Trackback: http://publish.creative-weblogging.com/publish/mt-tb.pl/55630
img Addthis img Ask img Blinklist img del.icio.us img Digg img Fark img Facebook img Google img Lycos img Ma.gnolia Add this page to Mister Wong Mr Wong img Netscape img Netvousz img Newsvine img Reddit img StumbleUpon img Slashdot img Tailrank img Technorati img Wink img Yahoo

Vote for Japan Gets Ready for New Wind Farm:

  • Currently 8.33/10
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
Rating: 8.33 out of 3 vote(s) cast.
 
Subscribe
Share It
RSSrss
See all blog subscribe options
Google google
What is RSS?
Yahoo! yahoo
Addthis Subscribe using any feed reader!
Bloglines Bloglines
Newsletter

TwitterFollow us on Twitter!